Payload integration connects a partner module to base-platform mobility, energy, control and service. Physically mounting a device is not enough; the complete configuration must be validated.
Mission context
A payload changes mass, centre of gravity, power, heat, electromagnetic conditions, data and workflow. Requirements should be recorded before adapter design.
Engineering approach
HARDY proposes a sequence: requirements → ICD → mock-up → integration → bench test → field test → configuration data sheet.
What must be demonstrated
Partners should share a common evidence package.
- mechanical, electrical and information compliance with the ICD;
- failure response, safe states and service access;
- full-mission report and compatible versions.